Thursday, November 26, 2026
Home Politics WATCH LIVE: STOP TAGWIREI: Gambakwe reveals letter to Chiefs

WATCH LIVE: STOP TAGWIREI: Gambakwe reveals letter to Chiefs

310

ATTENTION: President of the Zimbabwe Chiefs Council

Date: Sunday, 15 June 2025

Dear Esteemed Zimbabwean Chiefs,

SUBJECT: Notification of Protest to take place on 1 July 2025 Over the Corrupt Award of Victoria Falls Repair Road Contract to Tagwirei Group.

We write to formally notify you of the growing protest among Zimbabweans, particularly the people of Matabeleland, concerning the corrupt awarding of the Victoria Falls repair road contract to Tagwirei Group companies. Together, these companies have colluded on significant infrastructure projects such as the Harare Mbudzi interchange, road rehabilitation projects across Zimbabwe, and various mining infrastructure developments. Their intertwined ownership and repeated joint ventures raise concerns about monopolistic practices and lack of competitive bidding.

Zimbabweans nationwide reject the current contract award to the Tagwirei Group on the Victoria Falls Road as symptomatic of systemic corruption.

Demands

On behalf of the people of Matabeleland and concerned citizens, we demand that the government:

  1. Immediately suspends the current contract pending a full, independent audit and publishing all tender documents and contracts to restore public trust.
  2. Conduct a transparent and open re-tendering process compliant with Zimbabwe’s Public Procurement Act. The current Tagwirei group companies should be disqualified.
  3. Ensure active participation of local communities and traditional leaders in all stages. Re-design the new repaired road to include services such as Petrol stations, lodges and retail services that will be operated by local communities.
  4. Prioritize inclusion of local companies and workers from Matabeleland in the long-term toll collection on the road.
  5. Establish a community oversight committee for monitoring and accountability.

Tagwirei Group: A Corrupt Cartel

The Tagwirei Group companies awarded the Victoria Falls repair road contract are not independent entities but are closely linked through their association with businessman Kudakwashe Tagwirei and his extensive corporate empire. The consortium includes Tagwirei Group, Tensor Systems, Fossil Contracting, Masimba Construction, and Bitumen World. These companies have overlapping ownership, shared directors, and a history of collusion on large government infrastructure projects. Tagwirei Group companies have received government contracts worth over US$1.6 billion since 2017, benefiting from close ties to political leadership.

Tagwirei Group is the parent or controlling shareholder of many of these firms.

  • Fossil Contracting, managed by Obey Chimuka (a close business partner of Tagwirei), has worked jointly with Tagwirei companies on multiple projects.
  • Tensor Systems (Tendai Chikowore) and Masimba Construction (Tendai Masimba) have partnered repeatedly with Tagwirei companies on road construction and civil engineering projects.
  • Bitumen World (Farai Mlambo) has been involved in asphalt and bitumen supply contracts linked to Tagwirei’s network.

Kudakwashe Tagwirei controls a vast network of over 40 companies across sectors such as banking, oil and Gas, mining, petroleum, logistics, construction, and infrastructure development whose only business is to get government contracts. Most of the work that was previously done by Tagwirei group companies is not up to standard and in most cases remains incomplete. For example, the Mbudzi Interchange was over-inflated by $50 million and was delivered more than one year later. Another project, the Masvingo – Beitbridge road, is not complete after starting more than 10 years ago and similarly,  the Harare-Chirundu Road has not been awarded as the government waits for the Tagwirei Group to finish one project and go to the next one.

Hundreds of Zimbabweans have tragically lost their lives on these poorly maintained or incomplete roads, a direct consequence of this corrupt cartel’s “hogging” of critical infrastructure development.

Background and Contract Award Details

The tender for the rehabilitation of the Bulawayo–Victoria Falls Road was officially issued on 17 April 2025 and closed on 29 April 2025 long after the Tagwirei Group had started work on the ground. It became clear that a project of this magnitude cannot be evaluated in such a short space of time and a public outcry ensured. Following a secretive evaluation process, the contract was awarded to the same Tagwirei Group-led consortium, excluding any companies based in Matabeleland and despite the region’s direct stake in the project. Seven other companies were also reportedly awarded contracts for various 51km stretches of the 435km road. None of these contractors are from Matabeleland.

Reasons for Protest

The impending protest stems from grave concerns regarding the integrity, transparency, and fairness of the contract award process, specifically highlighting:

  • Lack of Transparency: The tender evaluation criteria, scoring, and the final decision-making processes have been deliberately withheld from public scrutiny, fuelling widespread suspicions of favouritism, cronyism, and outright corruption.
  • Exclusion of Local Companies: Despite the presence of capable and experienced construction firms within Matabeleland, none were shortlisted, awarded contracts, or even properly considered, indicating a deliberate and systematic marginalization of local businesses.
  • Absence of Community Participation: Traditional leaders and local communities, who are directly impacted by this project, were not consulted or involved at any stage of the tender or project planning phases, violating principles of good governance and local empowerment.
  • Economic Disempowerment: The discriminatory exclusion of Matabeleland-based companies and workers from this significant project denies the region’s communities crucial economic benefits, employment opportunities, and a stake in their own development.

Conclusion

We call upon you, our respected chiefs ,  to stand with your people in demanding justice, transparency, and fairness. Your leadership is vital in protecting your communities’ interests and ensuring equitable development. We trust you will treat this notification with the seriousness it deserves and support the call for an inclusive process. I write this letter on behalf of concerned citizens and of Nyokayemabhunu (Wellington Masiwa – who is currently jailed in South Africa at the instruction of the Zimbabwe Government).

Sincerely;

Pardon Gambakwe

Founder at Gambakwe Media

+27 68 526 7921, pardon@gambakwe.com

gambakwe.com
CC:

  • President’s Office
  • Zimbabwe War Veterans Associations
  • National Procurement Authority
  • Zimbabwe Anti-Corruption Commission
  • All Zimbabwe Churches
  • All Zimbabwe Political Parties
  • ZINASU and All University Student Representative Councils
  • M31 Coalition and Affiliates
  • Zimbabwe Republic Police
  • Zimbabwe National Army
  • National Association of NGOs
  • Zimbabwe Human Rights Commission
  • Zimbabwe Lawyers for Human Rights

 

 

error: Content is protected !!